The Solidaridad Project - Road Improvements
In 2007, all existing roads were repaired and widened to accommodate drilling and to prepare for future mining activities. The rainy season that begins in June and runs thru September creates problems for the roads. Without ditches and culverts the runoff erodes and creates impassable road conditions. The road before improvements adjacent a heading that has excellent gold, silver and copper values. The road was a foot path as shown. | Road after improvements. | Road before improvements taken near the top of the mountain in the "Main Zone" of mineralization. The road had deteriorated and vehicle access was impossible. | Road after improvements. |
|